Knowledge
Home > Knowledge > Content
How to operate the full automatic blowing machine safety and well
- May 09, 2018 -

Full automatic bottle blowing machine safe operation specification necessary knowledge.

(1) before starting each shift, you must add lubricating oil to each active part.(mechanical hand, manipulator guide, open die guide)

(2) the swing arm can be added (3-4) days.A small chain can be used once a month.Check the main engine reducer and the reducer for oil.Main engine bearing can be added once every 3 months.

(3) check whether the moving parts are solid before production, whether the screws are loose and loose, especially where the impact force is strong, whether the belt drive part is abnormal.

(4) check the high pressure gas source, low pressure air source, power supply and water supply.

(5) check the emergency stop switch, safety door switch and protection device to check whether the switch is normal.

(6) check whether the heating head is in the embryo and the part of the embryo is normal.If the embryo is not in place, the nut can be adjusted.

(7) check whether the lamp tube is damaged or broken.Change it in time.

(8) check whether the pneumatic components are leaking and are sensitive to action.

(9) check whether the triplet is abnormal, whether it is blocked, and whether the water cup is too full.

(10) when there is an abnormality in the automatic blow-bottle electromechanical magnetic valve, it should be cleaned in a timely manner, and the > should be cleaned once every 3.5 million bottles.